ImageSilo Maintenance Notification – Feb. 28, 2017

Start Date: February 28, 2017 (Tuesday)
Start Time: 20:00 (MST)
Finish Date: March 1, 2017 (Wednesday)
Finish Time: 04:00 (MST)

Purpose: Perform R82 Update to ImageSilo

Customer Impact: ImageSilo engineers will complete the upgrade of Imagesilo to R82. No customer impact is expected.

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Maintenance Notification – Feb. 10, 2017

Start Date: February 10, 2017 (Friday)
Start Time: 20:00 (MST)
Finish Date: February 13, 2017 (Monday)
Finish Time: 04:00 (MST)

Purpose: Perform Firewall Update

Customer Impact: ImageSilo engineers will be performing firewall updates. Due to the architecture of the systems affected, no customer impact is expected other than short periods of increased latency.

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Maintenance Notification – Jan. 13, 2017

Start Date: January 13, 2017 (Friday)
Start Time: 20:00 (MST)
Finish Date: January 16, 2017 (Monday)
Finish Time: 04:00 (MST)
Purpose: Perform firewall maintenance.
Customer Impact: ImageSilo engineers will be performing firewall maintenance. Due to the architecture of the systems affected, no customer impact is expected other than short periods of increased latency.

 

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Maintenance Notification – Oct. 14, 2016

Start Date: October 14, 2016 (Friday)
Start Time: 20:00 MDT
Finish Date: October 17, 2016 (Monday)
Finish Time: 04:00 MDT

Purpose: Perform update of load balancers.

Note: During the previous maintenance window, ImageSilo engineers identified an issue with the load balancer update that would have impacted customer access to some ImageSilo systems. As a result, the update was reverted without any customer impact. Engineering has worked with the load balancer vendor to identify a solution to the issue, and will be applying the load balancer update during this maintenance window.

Customer Impact: ImageSilo engineers will be applying an update to the ImageSilo load balancers and performing general maintenance on the domain infrastructure. Due to the redundant nature of the ImageSilo architecture, customer impact is expected to be limited to two periods of increased latency during failovers.

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Maintenance Notification – Oct. 7, 2016

Start Date: October 7, 2016 (Friday)
Start Time: 20:00 MDT
Finish Date: October 10, 2016 (Monday)
Finish Time: 04:00 MDT

Purpose: Perform update of load balancers.

Customer Impact: ImageSilo engineers will be applying an update to the ImageSilo load balancers and performing general maintenance on the domain infrastructure.  Due to the redundant nature of the ImageSilo architecture, customer impact is expected to be limited to two periods of increased latency during failovers.

 

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Maintenance Notification – Sept. 16, 2016

Start Date: September 16, 2016 (Friday)
Start Time: 20:00 (MDT)
Finish Date: September 19, 2016 (Monday)
Finish Time: 03:00 (MDT)

Purpose: Preemptive storage hardware replacement.

Customer Impact: ImageSilo engineers will be replacing a failing component of a storage array that serve databases. Due to the redundant nature of the ImageSilo architecture, the only expected impact is two short periods (30 seconds) of slightly reduced database performance.

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Emergency Maintenance Notification – Apr. 18, 2016

Start Date: April 18, 2016 (Monday)
Start Time: 17:00 (MDT)
Finish Date: April 20, 2016 (Wednesday)
Finish Time: 04:00 (MDT)
Purpose:  Address database server failure.
Customer Impact:   ImageSilo engineers have been continuing to investigate a failure of one of the members of the database clusters. Engineers will work with the hardware vendor to replace failed components on the cluster member, after which testing may cause brief periods (expected to last approximately 2 minutes) of inaccessibility as the cluster is failed-over to confirm the repairs.

 

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Maintenance Notification – Apr. 15, 2016

Start Date: April 15, 2016 (Friday)
Start Time: 20:00 (MDT)
Finish Date: April 18, 2016 (Monday)
Finish Time: 04:00 (MDT)

Purpose: Perform maintenance on a database cluster.

Customer Impact: During this maintenance, ImageSilo Engineers will be applying hardware firmware updates to all members of one of the database clusters. Due to the redundant nature of ImageSilo, the expected impact of this maintenance is up to three periods (each up to approximately two minutes) of inaccessibility while the database cluster is failed over.

 

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Emergency Maintenance Update – Apr. 6, 2016

The Emergency Maintenance performed through  04:00 (MDT) today has been closed. No customer impact occurred during the maintenance and the affected cluster remains stable and fully operational. Engineers continue to work with hardware and software manufacturers to determine a root cause of Tuesday’s failure of the single database cluster member. If additional steps are required which may impact availability, another Maintenance notification will be issued.

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.

866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Emergency Maintenance Notification – Apr. 5, 2016

Start Date: April 5, 2016 (Tuesday)
Start Time: 05:35 (MDT)
Finish Date: April 6, 2016 (Wednesday)
Finish Time: 04:00 (MDT)

Purpose: Address database server failure.

Customer Impact: ImageSilo engineers have been investigating a failure of one of the members of the database clusters. Due to the redundant architecture of ImageSilo, the affected database cluster failed over to the redundant member and is currently serving requests. Engineers will perform the necessary steps to stabilize the affected cluster. This may cause brief periods (expected to last approximately 2 minutes) of inaccessibility as the cluster is repaired and fail-over tests are performed. An update will be sent when more information is available.

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com