ImageSilo Emergency Maintenance Notification – Jun. 29, 2010

Start Date: June 29, 2010 (Tuesday)
Start Time: 1:45 PM (MDT)
Finish Date: June 30, 2010 (Wednesday)
Finish Time: 5:00 AM (MDT)

Purpose: ImageSilo engineers will be replacing failed hardware in the ImageSilo storage systems.

Customer Impact: ImageSilo Engineers will replace a failed fibre channel controller in one of the disk trays of a storage system. Due to the redundant nature of the storage systems and the failed part, no customer impact is expected.

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Maintenance Notification – Jun. 18, 2010

Start Date: Friday, June 18, 2010
Start Time: 20:00 PM (MDT)
Finish Date:  Monday, June 21, 2010
Finish Time: 03:00 AM (MDT)

Purpose: Make some minor changes to the ImageSilo network topology.

Customer Impact: ImageSilo engineers will be making some minor changes to the ImageSilo network topology to provide better system management bandwidth for ImageSilo engineering and administration. No customer impact is expected.

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com

ImageSilo Emergency Maintenance Notification – Jun. 15, 2010

Start Date: June 15, 2010 (Tuesday)
Start Time: 1:15 PM (MDT)
Finish Date: June 16, 2010 (Wednesday)
Finish Time: 5:00 AM (MDT)

Purpose: ImageSilo engineers will be replacing failed hardware in the ImageSilo storage systems.

Customer Impact: This morning, ImageSilo storage systems experienced a processor failure. Due to the high level of redundancy, the redundant partner of the failed node immediately took control of the affected storage volumes, which was completed within 45 seconds. A replacement motherboard and processors have been dispatched, as well as a vendor-badged engineer to aid in the repair. There is no expected customer impact for the repair of the failed equipment. However, when the failed node is fully restored and control is returned, it is expected that another single 45 second period of latency may occur.

Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com