Start Date: November 19, 2010 (Friday)
Start Time: 20:00 (MST)
Finish Date: November 22, 2010 (Monday)
Finish Time: 04:00 (MST)
Purpose: Complete ImageSilo’s 2010 server infrastructure upgrade.
Customer Impact: ImageSilo engineers will be completing the server infrastructure upgrade (which has replaced nearly every server in ImageSilo’s network). This final step will require physically moving the network switching components and some servers. The redundant nature of the network architecture coupled with extensive use of NIC teaming should minimize and customer impact. However, there will be necessary cluster failovers on load balancers, firewalls, and database clusters. Most of these failovers (specifically for load balancers and firewalls) typically cause minimal cause very short (less than 5 seconds) periods of increased latency. Database cluster failovers are expected to cause brief periods (expected to be less than 2 minutes) of service impact.
Questions/Comments: Please feel free to contact ImageSilo Administration with any questions or comments.
866.374.3569 (303.493.6900)
siloadmin@imagesilo.com